    Thought I'd ask Mr Google.

    Looks like the final more accurate costings for the project are based on the FEED. So even though they may have worded it wrong in the announcement it looks to me working on it now with SMS the EPC contractor would be about right?

    My bold highlights

    FEED stands for Front End Engineering Design. The FEED is basic engineering which comes after the Conceptual design or Feasibility study. The FEED design focuses the technical requirements as well as rough investment cost for the project. The FEED can be divided into seperate packages covering different portions of the project. The FEED package is used as the basis for bidding the Execution Phase Contracts (EPC, EPCI, etc) and is used as the design basis.
    A good FEED will reflect all the clients project specific requirements and avoid significant changes during the execution phase.
    FEED Contracts usually take around 1 year to complete for larger sized projects. During the FEED phase there is close communication between Project Owners and Operators and the Engineering Contractor to work up the project specific requirements.

    https://www.epcengineer.com/definition/556/feed-front-end-engineering-design
    Last edited by noodly: 06/03/18
 
watchlist Created with Sketch. Add TVN (ASX) to my watchlist
(20min delay)
Last
4.7¢
Change
-0.001(2.08%)
Mkt cap ! $81.19M
Open High Low Value Volume
4.7¢ 4.8¢ 4.5¢ $235.2K 5.063M

Buyers (Bids)

No. Vol. Price($)
1 345105 4.7¢
 

Sellers (Offers)

Price($) Vol. No.
4.8¢ 571500 3
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
TVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.