Originally posted by kcheers
↑
You covered that well. production in 12 months appears near impossible when were still trying to do a few holes. wet weather again every year for about 3 months. A road is not going to be finished in that time with bridges etc IMV. the power and dams will take time too. there is a huge amount of machinery, materials and infrastructure to roll down a road that takes a week for a 4wd and 5 months for a truck laden with a drill apparently. Most of the above is not to be taken as wholly accurate but it will indeed be a challenge that man or machine cannot posibly achieve.....if no road is there to carry it all in? i feel it will be early next year before the road will be ready for sealing the final stretches. Im sure the road gangs will not want excessive heavy vehicles upsetting their road base preparations.
Expand
Muddy ground and poor existing infrastructure in the DRC are meaningless folks. Recent history shows that if the Chinese want it they will work hard and fast to achieve their objectives. Nothing will get in their way. There is a solution to every engineering and logistical problem. Time will tell. Happy to be proven wrong.
http://m.dw.com/en/china-keeps-buil...5980?xtref=https%3A%2F%2Fwww.google.com.au%2F
https://en.m.wikipedia.org/wiki/Three_Gorges_Dam