ECobalt, US cobalt project (0.59% co & 0.7% cu), has a Capex of US$187m for 1mtpa.
NZC, DRC near surface deposit (0.37% co & 3% cu), using DMS low capex of US$53m for 1mpa, recovery rate for copper 64% & cobalt 40%; or using high capex (Leach) of USD$245m for 1mtpa, recovery rate could improve to 90% for copper & 75% for cobalt.
CLA, cobalt grade is substantially lower than ECbalt and NZC, if set up a 2mtpa for 0.13% co, should cost a lot more, imo.
I know a laterite deposit requires much higher capex, around 2x, ARL, 1mtpa, capex A$599m.
Grade, Thickness, depth, time to production, dilution, many factors to consider, imo.
http://www.ecobalt.com/assets/docs/170927_ECS-Technical-Report.pdf
- Forums
- ASX - By Stock
- CLA
- my ammended CLA valuation
my ammended CLA valuation, page-45
-
- There are more pages in this discussion • 152 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLA (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $26.70M |
Open | High | Low | Value | Volume |
1.0¢ | 1.1¢ | 1.0¢ | $30.43K | 2.790M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 6298099 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 569000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 6287599 | 0.010 |
15 | 6252441 | 0.009 |
8 | 6856074 | 0.008 |
3 | 1588560 | 0.007 |
3 | 2200000 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 569000 | 2 |
0.012 | 733849 | 2 |
0.013 | 913728 | 6 |
0.014 | 263858 | 2 |
0.015 | 3417586 | 9 |
Last trade - 16.10pm 05/08/2024 (20 minute delay) ? |
Featured News
CLA (ASX) Chart |