CLA 0.00% 1.1¢ celsius resources limited.

my ammended CLA valuation, page-45

  1. 34,338 Posts.
    lightbulb Created with Sketch. 9114
    ECobalt, US cobalt project (0.59% co & 0.7% cu), has a Capex of US$187m for 1mtpa.

    NZC, DRC near surface deposit (0.37% co & 3% cu), using DMS low capex of US$53m for 1mpa, recovery rate for copper 64% & cobalt 40%; or using high capex (Leach) of USD$245m for 1mtpa, recovery rate could improve to 90% for copper & 75% for cobalt.

    CLA, cobalt grade is substantially lower than ECbalt and NZC, if set up a 2mtpa for 0.13% co, should cost a lot more, imo.

    I know a laterite deposit requires much higher capex, around 2x, ARL, 1mtpa, capex A$599m.

    Grade, Thickness, depth, time to production, dilution, many factors to consider, imo.

    http://www.ecobalt.com/assets/docs/170927_ECS-Technical-Report.pdf
    Last edited by 8horse: 01/04/18
 
watchlist Created with Sketch. Add CLA (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.000(0.00%)
Mkt cap ! $26.70M
Open High Low Value Volume
1.0¢ 1.1¢ 1.0¢ $30.43K 2.790M

Buyers (Bids)

No. Vol. Price($)
16 6298099 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 569000 2
View Market Depth
Last trade - 16.10pm 05/08/2024 (20 minute delay) ?
CLA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.