Hopefully we get information on the progress of the sidetrack today in a well update.
I see the main risk as drilling through the reservoir to the suspected GWC mark. The well may lose a lot of water-based mud to get through the Plover formation. The pumping facilities on board will be put to the test!!
No use of Loss Control Material in this round of Plover drilling which is good for when production testing commences. Hopefully the slotted liner will remain free of debris for a good production test.
Good luck to all holders.
Antman.