Ann: Update on Hammer Mill 3 Commissioning, page-55

  1. 1,961 Posts.
    lightbulb Created with Sketch. 38
    To put this into persepective.. previous management ran the same ore through and got what .. 1.7g per ton (ie development and low grade ore )

    Here we are with 7.5 days worth going through - and returning over 3 times previous management whilst commissioning. 6.4gt - thats a LOT better from development material.

    i think a lot of people had talked themselves into thinking we would have march and april production (run of mine high grade ore) going through with bonanza grades of 20g per ton.. there is a lot to fix and get right - as indicated many issues still in the gecko that need addressing - and this announcement seems to say that they have addressed them.

    Bring on May - may it be on time and high grade.
 