I thought they were going to release a revised JORC with the stage 2 feas? Must be wrong, hopefully it’s around the corner. Couple of notes...
The stage 1 DFS was $411m at pricing of USD$539/t. This stage 2 is $834m or adds $423m incremental NPV of which the bulk of this uplift will be a result of changing the price assumption from US$539/t to US$690/t.
Opex doesn’t come down - from $316/t in stage 1 up to $324/t stage 2 - all excl. royalties .. the the economies of scale of a larger facility do not reduce costs over and above increased strip ratio... which I find weird.
The royalty increases from 5% to 8.5% reflecting my belief that the stage 1 figures missed the AGO royalty (5% on one lease).
The incremental capex of $120m seems incredibly high also given stage 1 was quoted at $140m - much of the infrastructure shouldn’t require duplication.
Not the greatest result - all driven by the price assumption jump to US$690/t... hopefully the JORC update is around the corner and adds tonnes and grade.
- Forums
- ASX - By Stock
- 1MC
- Ann: Stage 2 DFS at Pilgangoora Delivers Outstanding Results
Ann: Stage 2 DFS at Pilgangoora Delivers Outstanding Results, page-14
-
-
- There are more pages in this discussion • 181 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 1MC (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.364M |
Open | High | Low | Value | Volume |
3.0¢ | 3.0¢ | 3.0¢ | $2.502K | 83.41K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 37537 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 364484 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 37537 | 0.030 |
3 | 469644 | 0.029 |
2 | 85700 | 0.028 |
1 | 61938 | 0.027 |
1 | 37074 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 364484 | 5 |
0.032 | 92168 | 2 |
0.033 | 378549 | 3 |
0.035 | 200000 | 1 |
0.040 | 40000 | 1 |
Last trade - 16.10pm 14/10/2024 (20 minute delay) ? |
Featured News
1MC (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, Managing Director & CEO
Charles Armstrong
Managing Director & CEO
SPONSORED BY The Market Online