prato
Please excuse our rude friend.
The delay in drilling was mentioned in the quarterly report, which was released on Monday.
"The drilling pad has been completed and the rig is being assembled on the pad. Rigorous inspections of the rig has discovered minor defects which are being rectified. Spudding of the well will occur thereafter." Page 8 of CTP report.
This kind of repairs can be apparent when sophisticated equipment is transported over long distances. It can be exacerbated when the road network is not your typical bitumen highway.
I am confident that shareholders will hear from the Company when the well is underway.
Patience. AL
- Forums
- ASX - By Stock
- CTP
- For Spuds sake!
For Spuds sake!, page-3
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $37.00M |
Open | High | Low | Value | Volume |
5.0¢ | 5.1¢ | 5.0¢ | $27.35K | 543.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 66613 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 96556 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 66613 | 0.050 |
2 | 548291 | 0.049 |
3 | 125520 | 0.048 |
2 | 173952 | 0.045 |
1 | 50000 | 0.044 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 96556 | 1 |
0.056 | 19995 | 1 |
0.058 | 172431 | 1 |
0.060 | 122209 | 3 |
0.062 | 112737 | 2 |
Last trade - 16.10pm 10/09/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |