Hi Davo77.
There are 2 drill rigs onsite at present,Ausdrill sending 2 from Australia plus 1 they have aquired from Africa. SDL ordered another 2 new rigs which are ,on the way from South Africa, 7 rigs in total soon.
They would not be getting that many drill rigs on site if there was not a lot of iron plots to drill.
I am with gasman9, 2 to 3 billion tonnes if not more.
Regards
Westcott.
- Forums
- ASX - By Stock
- SDL
- big tick
big tick, page-11
-
- There are more pages in this discussion • 55 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)