Jocam9 "looks like Petsec has only just started V258 according"
from 08/12/2003 Exploration Programme Update "Two wells, to be drilled from the "A" location, are planned to test 36 billion cubic feet (bcf) of unrisked mapped potential gas (30 bcf net to Petsec) in multiple targets. A rig was contracted on December 6 2003 and the programme commenced. . It is expected to take approximately four weeks to drill the two wells."
Your view is what I expected also? Two well's I doubt being drilled simultaneously? So one well will be targeted at a time usually takes around 7 days for first a stop then they start the second a few days later.
So results for this well could still be this week?
- Forums
- ASX - By Stock
- PSA
- bit red faced....
bit red faced...., page-2
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PSA (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online