AZS 0.00% $3.69 azure minerals limited

Ann: Further Impressive Drill Results from Oposura, page-6

  1. 30,334 Posts.
    lightbulb Created with Sketch. 1837
    Very broadly, $30 mil per year from Oposura.
    Divide by 111 mil shares on issue.
    = .27c approx.

    Price to earnings is about 6 times in this sector.

    $1.62 per share valuation.

    This is just for Oposura. No other value given for Alacran deposits or Sara Alicia.

    Naturally Opex and capex must be taken out.

    Capex is broadly $40mil. Very low.
    Opex is very low as set out in San Felipe analysis reposted several times recently.

    So in about 1.5 years from production Oposura would be debt free.

    A standard timeframe before decision to proceed to build a mine is about 2 years. Oposura will be fast tracked, 12 months from PEA is rapid.

    The market is going to wake up to the numbers sometime soon, most likely after the PEA is issued mid year.

    Meanwhile we never seem short of detractors, and diversions.
 
watchlist Created with Sketch. Add AZS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.