As I understand it they are now
Assembling/ Constructing: 3 weeks into a 6-8 week program
Drilling: 1 week into a 3-4 week drilling and encasing program
I would like to hear or see updates letting us track progress towards first flow of gas. Not sure if first flow will rocket the share price as much as I expect it should- perhaps the fundies will want a full monthly or so or flow.... testing for quality and flow rate, make sure no explosions or whatnot, before she's really off to the races
Do any tech bods here know if it needs a month or so to monitor/ test the gas flow information or if it is basic science and they'll know reasonably fast? Or is it a known quality (ie chemical reaction) and the question is mostly about flow rate?
- Forums
- ASX - By Stock
- NRZ
- Drilling, assembling, gas flow
Drilling, assembling, gas flow
-
-
- There are more pages in this discussion • 41 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.724M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NRZ (ASX) Chart |
Day chart unavailable