ADY 0.00% 0.9¢ admiralty resources nl.

announcement out, page-3

  1. 66 Posts.
    Just read it, should be available to all now.

    And GREAT NEWS.......

    RINCON SALAR UPDATE
    Headlines
    One tonne of lithium Carbonate produced at high grade from pilot plant
    Monthly pilot plant production expected to be 10 tonnes per annum before expansion
    Project finance proceeding according to timetable
    Tender process for agency and sale of 10% lithium products completed first phase
    The Board of Directors is delighted to announce that:
    • The pilot plant at the Rincon was successfully commissioned on 20 December 2007
    and is now operating above expectations for production volumes, with the first
    production of lithium carbonate produced on 25 January 2008.
    • This one tonne of lithium carbonate has been produced with a purity of 99.0+%
    exceeding the expectations from previous research indicating that future processing
    will enable production of high purity lithium products.
    • The production boreholes from where the brines are extracted are performing above
    their expected production capacity and have the properties to yield four times the
    required volume for a plant in full production at 17,000 tonnes per annum.
    • The Rio Grande Salar that was recently acquired is now entering into production and
    we expect the first commercial output of sodium sulphate, a major input into the
    production process, in May 2008 in advance of our scheduled production date.
    • The pilot plant will reach a steady state continuous production in early April of 10
    tonnes per month as planned giving the successful commissioning, we are
    immediately implementing our expansion to a full size plant by trebling the size of the
    ponds in the next three months.
    • The initial operating costs which have not yet reached optimisation have been
    contained to well below the market price for the products.
    • Basic engineering for the full-scale plant is now complete and detailed engineering
    and quotations for major items is underway.
    • We continue to plan for full plant production in 2009.
    • Project financing continues with legal diligence and engineering due diligence
    underway.
    • The company is implementing a strategic program for the identification and acquisition
    of further mineral resources in the region. This project is being managed by Dr
    Alonso.
    We are now investigating by-products from lithium and magnesium hydroxide production with
    the view to increase earnings from the existing production.

 
watchlist Created with Sketch. Add ADY (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.000(0.00%)
Mkt cap ! $14.66M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
3 188559 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 622455 2
View Market Depth
Last trade - 16.12pm 18/09/2024 (20 minute delay) ?
ADY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.