at the EGM they said everything was on track
Now as I mentioned before, delayed to Sep as per their April preso.
![]()
This paragraph tells me what I already knew, they have to find more resources to justify a 20 year LOM.
As a result, Australian Mines, in collaboration with lead engineering firm Ausenco7 , are presently re-evaluating the location and layout of the full-scale cobalt-nickel-scandium processing plant, and associated non-processing infrastructure to ensure the final site design enables maximum operational efficiency (and, thus, the lowest possible operating costs for the project) in tandem with optimising the Sconi Project’s Life-of-Mine.
Also, has anyone actually checked that in the Assay Summary, the Cobalt (%) is still very low? Only 11 of those results are above 0.1.
- Forums
- ASX - By Stock
- AUZ
- Ann: Preliminary findings indicate additional mineralisation
Ann: Preliminary findings indicate additional mineralisation, page-60
-
- There are more pages in this discussion • 525 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUZ (ASX) to my watchlist
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.18M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.8¢ | $4.722K | 590.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
19 | 13914107 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 2205891 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
21 | 14414107 | 0.008 |
29 | 18748579 | 0.007 |
17 | 11334558 | 0.006 |
10 | 6010000 | 0.005 |
7 | 5480000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 2205891 | 14 |
0.010 | 5129370 | 26 |
0.011 | 5386784 | 18 |
0.012 | 5415576 | 9 |
0.013 | 1850000 | 4 |
Last trade - 11.06am 05/08/2024 (20 minute delay) ? |
Featured News
AUZ (ASX) Chart |