Hi everyone,
Some great detective work happening here on bid.rod's videos, and elsewhere on the OGX forums!
A big thanks to the guilty parties!
However, I think it is wise to avoid jumping to conclusions from the videos about HM3 only doing higher-grade material at low throughput rate.
Bid.rod said that during his visit:
"A new supplier was on the site, and he was delivering brand new harmers to the Company, free of charge for a trial. Each piece weighting 21 kg was promised by the representant of the Company Centro-Oeste Engenharia, that they could last 3 to 4 times longer than the current supplier..."
This may mean that when Bid.rod took the videos, HM3 was in the process of winding down to a stop in order to
change to the new supplier's hardened hammers.
That may not have been a typical period of HM3 throughput.
IMOO,
All the best,
T
[alias John Watson, friend of Sherlock Salt and Sherlock Johnny]
- Forums
- ASX - By Stock
- OGX
- Have a Ganda at the Gravity plant running at full spec?
Have a Ganda at the Gravity plant running at full spec?, page-51
-
- There are more pages in this discussion • 124 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost