COB 0.00% 6.9¢ cobalt blue holdings limited

Ann: Thackaringa Cobalt Project Pre-Feasibility Study, page-49

  1. 3,790 Posts.
    lightbulb Created with Sketch. 519
    Found this statement perhaps the most significant:

    "Empirical recovery of cobalt in the testwork was 86.8% from ore to cobalt sulphate. This was de-rated to 85.5% to allow for scale-up to commercial production. Optimisation of cobalt recovery, in the BFS, could have a positive impact on project economics. Sensitivity analysis in the PFS, showed that a 1% increase in cobalt recovery, increased post-tax NPV (7.5% WACC) by 3.3%, and a 5% increase in sulphur recovery increased post-tax NPV (7.5% WACC) by 2.4%. Cobalt Blue has an aspirational target of 90% cobalt recovery, with higher cobalt recovery potentially achievable by improved liberation of pyrite in the concentrator circuit by using a finer particle size (a finer particle size resulted in a 2% increase in cobalt recovery in the concentrator circuit, as reported in ASX Announcement 27th Dec 2017) and use of recycle streams throughout the flowsheet to minimise cobalt losses."

    So if they hit an aspirational target of 90% recovery of cobalt then IRR increases by 4.5 x 3.3 = 14.85% so up to 35.85% before any mine life increases? Is this correct?
 
watchlist Created with Sketch. Add COB (ASX) to my watchlist
(20min delay)
Last
6.9¢
Change
0.000(0.00%)
Mkt cap ! $29.15M
Open High Low Value Volume
6.7¢ 7.0¢ 6.7¢ $8.612K 125.2K

Buyers (Bids)

No. Vol. Price($)
1 1036 6.9¢
 

Sellers (Offers)

Price($) Vol. No.
7.0¢ 45924 4
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
COB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.