POL 0.00% 29.5¢ polymetals resources ltd

the path to significant rerating

  1. 4,724 Posts.
    This is how I see it playing out in coming weeks/months.

    March

    YILGARN PROJECT (target 150-200mt Hemetite-Geothite DSO)

    - Carina Results and initial Jorc resource statement (first hole of 12 gave 106m @ 58.7%fe, hemetite-geothite intesected at similar widths over 1.5km strike, open at depth and along strike)

    - update on drilling at Chameleon, Vela, J4 extension and Musca that has now been completed, possible initial assays for chameleon.

    - update on further drilling program set to start up again in april, possibly including Bungalbin drill program (mineral deposit drilled by BHP in 1960's with 69mt@59%fe)

    -details of Portman agreement regarding tenements containing Bungalbin east and J4. (commercial agreement agreed in principle, details pending)


    POONDANO PROJECT (target 10-15mt CID DSO)

    -drill results from extensive in-fill program at west and east CID. Initial JORC resource statement.

    -update on drill program set to test central mesas and on bulk metallurgical sampling program.


    April

    YILGARN PROJECT (target 150-200mt Hemetite-Geothite DSO)

    -drill results for Chameleon, Vela, J4 extension and Musca (or at least for several of these targets)

    -initial JORC resource statements for Vela and J4 extension

    -New drill program underway testing additional discrete targets and extension of Carina strike, possibly Bungalbin also.


    POONDANO PROJECT (target 10-15mt CID DSO)

    -New drill program underway testing central messas and infill of east CID.

    -update metallurgical testing program


    May-July

    YILGARN PROJECT (target 150-200mt Hemetite-Geothite DSO)

    -further drill results from initial drill program and april program (Carina extension, Bungalbin, discrete targets)

    -Pre-feasibility study completion on 10mtpa DSO operation over 10-20years (2010 mine commencement), shipping DSO through new Kiwana Port via established rail link.

    -likely Off-take agreement to Polaris strategic partner (19.6% stakeholder) "Lion group malaysia-steel division".

    -formal agreement of current MOU with Toll malaysia for shipping and handling of ore.

    POONDANO PROJECT (target 10-15mt CID DSO)

    -further drill results from april drilling program, and metallurgical testing program.

    - Pre-feasibility study completion on 2.5mtpa DSO operation over 5years+ (mid 2009 mine commencement), shipping through new berth at Port Hedland, close proximity with only 30km of ore trucking required.


    WEELUMURRA AND CALINWINGA PROJECT(target 210-310mt CID DSO)

    -new drill program testing the 250mt-310mt CID targets (with average grades of approx 58-60%fe), next door to FDL/FMG tergets/resources.



    Market cap at this stage?....wont be the current $70mill that's for sure.

    Polaris represents incredible value at present price IMO.

    cheers.
 
watchlist Created with Sketch. Add POL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.