KAS 0.00% 1.5¢ kasbah resources limited

Ann: 2018 Achmmach Tin Project Definitive Feasibility Study, page-9

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 1,606 Posts.
    lightbulb Created with Sketch. 155
    from the website The Taronga Tin project is currently 100% owned by ASX-listed Aus Tin Mining (ANW). The asset has a JORC (2012) reserve of 22mt @ 0.16% Sn for 35,600t of contained tin. A Preliminary Feasibility Study (PFS) was recently completed for an open cut mine, generating up to 3ktpa of contained tin over a 9.3 year mine life. Initial capital for the mine was estimated at A$88m, with a C1 cash cost of A$17,935/t(sorry did miss the AUD) so 1334USD compared to C1 cash cost of US$9,176/tonne of tin for KAS.
 
watchlist Created with Sketch. Add KAS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.