ARL 2.56% 40.0¢ ardea resources limited

Valuations for ARL - FA only., page-6

  1. 781 Posts.
    lightbulb Created with Sketch. 136
    This is the way I have been looking atestimates for 2.25mtpa CAPEX, firstly it is clearly stated in the PFS reaching 2.25mtpa from the 1.5mpta train is possible with much of the same equipment just optimisation and reduced residence time meaning in order for the cost to blow out on paper as you have stated both the 1mpta and 1.5mpta PFS would be incorrect.

    Secondly I would argue that if you wanted to use anybody as a comp for ARL you can only really use AUZ in Aus as they are using the same tech and same lab Simulus. There are some very qualified engineers over there (EG Flippa) who are all estimating $800-850mUSD for 2mtpa.

    CLQ has choosen a different path which is many respects makes them uncomparable now.

    Due to the ore at KNP and potentially using a smaller plant for higher throughput I think our CAPEX will come in at or below this level my estimate is $790m USD inc the Sc circut.

    I know I have posted this previously though probably relevant again.
 
watchlist Created with Sketch. Add ARL (ASX) to my watchlist
(20min delay)
Last
40.0¢
Change
0.010(2.56%)
Mkt cap ! $79.87M
Open High Low Value Volume
39.0¢ 40.0¢ 38.5¢ $17.98K 46.08K

Buyers (Bids)

No. Vol. Price($)
1 76960 39.0¢
 

Sellers (Offers)

Price($) Vol. No.
40.0¢ 72533 3
View Market Depth
Last trade - 14.08pm 08/11/2024 (20 minute delay) ?
ARL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.