When you look at the fact they have increased the grade by 30%, this almost works out to a tonnage double from the last calculation at 1.1% (around 80kt at previous cutoff). That isn't bad for a couple of months work. There is still the A&B deeps to be drilled and modelled up. The next few months should be interesting.
Add to My Watchlist
What is My Watchlist?