GOLD 0.51% $1,391.7 gold futures

mli a gold and uranium zero cost

  1. 2,739 Posts.
    lightbulb Created with Sketch. 2
    production starting October 2008 - at a rate of 1 mill lbs of U3O8 and 60,000 oz of gold.

    Worth researching.

    Best of both worlds perhaps ?.. with both U3O8 and Au in tailings.

    tailings are low grade but very cheap to process as they have been already been mined and milled .. ready to be processed.

    according to MLI's costings ..
    will be a zero cost U3O8 producer after gold by product credits with gold at $450/oz. .. see their Feb 5th announcement page 8.

    production starts October 2008.


    can be considered a gold producer with U3O8 to boot.
 
watchlist Created with Sketch. Add GOLD (COMEX) to my watchlist
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.