ABR 0.00% $2.65 american pacific borates limited

Ann: ABR to increase Fort Cady Borate mine size, page-3

  1. 850 Posts.
    lightbulb Created with Sketch. 5
    I posted this on 27/06/2018:

    Time Line:
    1) 2H 2018 - DFS to be ready
    2) Air permit - required for construction - to be lodged in the next few weeks (takes few months to get approved)
    3) Water permit - required for production - to lodged by Q4 2018 (takes few months to 18mths worse case scenario to get approved)
    4) All ready to proceed with construction by Mid CY2019

    Now water permit is crossed out of the list
 
watchlist Created with Sketch. Add ABR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.