CVN 3.13% 15.5¢ carnarvon energy limited

poe news, page-3

  1. 354 Posts.
    Rule of thumb, if it aint here by now it won't be coming tonight.

    My take on the duo and there releases;

    They are smart, they always seem to try and time two releases together. One well is a bit of exploration, while the other is a sure thing (they admitted that themselves)

    The delay makes me assume that L44-R isn't a production level discovery, but they might be delaying the test results due to the NS1-D1 rls which is aiming for a bump in production in the same ann (NS1-D1, should be at TD today with an ann due on that now). Make sense?? It happened not that long ago..



    They have done this before. The sp pulled back on a late ann and they wacked us with a positive secondary well test result. I can see history repeating.

    POE-9A should also be on test today. Big run to the end of the week imo..

    All info from the March 4 ann.

    There will be a bopd increase within 1 week.





 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.