I am still waiting news, GXY are taking their time - but I did notice in page 3 of their recent announcement that the JV block is indicated twice, in 2 different stages of developing drilling targets for pegmatite exploration.
The first is directly to the North, North-East of Mt. Cattlin (circled in RED - small circle), The second is to the North-East of Mt. Cattlin (to the right of that small circle - both partially or wholly inside the JV block.
The focus will be on targets immediately north of Mt Cattlin as well as mineralized pegmatites to the west of Mt Cattlin (Figure 1 above). An additional 10,000m of drilling will target open extensions of the Mt Cattlin Orebody to the west and north beyond the extents of current drilling. A further estimated A$3M will be expended on brownfield and greenfield exploration activity in H2, 2018.
So it looks like the GPR is being analysed and drilling is to start H2 2018
It seems there has been a few barbs fly this way and that - but it does look like there will be some results to actually update the market with soon. GXY want more than single digit mine life as do all Lithium miners.
We are 2 months into H2 2018 already - probably only another 2-3 months at the most before some results are known.
SK60
- Forums
- ASX - By Stock
- TKL
- GXY Summary of planned works
GXY Summary of planned works
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TKL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.945M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 29079999 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 75087551 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 29079999 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 75087551 | 22 |
0.003 | 15745385 | 8 |
0.004 | 2567921 | 4 |
0.005 | 4192227 | 2 |
0.013 | 268689 | 1 |
Last trade - 16.12pm 15/10/2024 (20 minute delay) ? |
Featured News
TKL (ASX) Chart |
Day chart unavailable
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online