KEY 0.00% 0.1¢ key petroleum limited

time to buy, page-21

  1. 18,930 Posts.
    lightbulb Created with Sketch. 166
    The first field drilled was a 250bcf target, which was P&A.

    The 2nd structure targeted at Kiliwani North was a seperate 10-5bcf gas target and a small oil target - presumably based on seismic results.

    However they state that results have 'exceeded expectations'.

    I don't know enough about gas exploration to determine the significance of the 60m column and the evidence of gas in the tertiary sandstones.
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.