FBR 4.76% 4.0¢ fbr ltd

Ann: Hadrian X Dynamic Stabilisation Test Successful, page-25

  1. 13,243 Posts.
    lightbulb Created with Sketch. 73
    From 7th June announcement

    "As outlined previously, after DST™ testing, the Hadrian X programme will move to the Factory Acceptance Testing (‘FAT’ phase, where the Hadrian X will build structures in different configurations within a controlled factory environment. This testing process is scheduled to take several months."

    Today's announcement (further DST)

    "further DST testing with the maximum load of Hadrian optimised blocks, before commencing Factory Acceptance Testing, where the Hadrian X will build structures in different configurations within a controlled factory environment."

    Perhaps the whole process is several months, perhaps FAT is several months (to allow for different configurations and programming), hard to say, hence happy to sit by and watch it unfold before an investment if it all works. Interesting the use of different applications wording now for the technology...
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
4.0¢
Change
-0.002(4.76%)
Mkt cap ! $178.1M
Open High Low Value Volume
4.3¢ 4.4¢ 3.9¢ $826.2K 19.63M

Buyers (Bids)

No. Vol. Price($)
2 191169 4.0¢
 

Sellers (Offers)

Price($) Vol. No.
4.1¢ 762777 2
View Market Depth
Last trade - 16.10pm 23/07/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.