What’s your defintiton of good? Good for commissioning? Are you expecting them to be at design in the first month?
Lots of critics following this story and they certainly get chirpier when the share price is dropping.
Not a lot of people with ideas of the timing of commissioning a project. It usually takes a few months to get right assuming no mechanical failures or major downtime.
For those that don’t here’s IGOs commissioning rates for Nova. taken from their site visit presentation here. LOM recoveries supposed to be high 80s% https://www.asx.com.au/asxpdf/20170313/pdf/43gqz3p2p0qqrh.pdf