From the August 28 Announcement:
"Drilling and further EM surveys at Investigators continue to identify additional significant sulphide mineralisation. In addition to testing the DHEM targets discussed above, drilling in the current programme will include:
Drill hole details for the first three holes in the current programme are shown below. Further details of other drill holes will be provided shortly."
- More step-out drill holes to the north, to further test the down plunge continuity of mineralisation; and
- Infill drilling along the 1.5km strike (east-west) of the Investigators ultramafic.
My take is that the step out drilling to the north relates to MAD60.
It is worth remembering that the current drill program is over 4000m and it is unlikely that they have drilled more than 600m.
Based on the 28/8 announcement, there should be an announcement, soon, about the infill and step out drilling. Perhaps RC drilling might be used for those sections of the drill program?
Some news is eagerly awaited
Cheers
Mulac1
- Forums
- ASX - By Stock
- SGQ
- When will we know...
When will we know..., page-87
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $27.21M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
SGQ (ASX) Chart |
Day chart unavailable