C7A 9.09% 1.2¢ clara resources australia ltd

Ann: Development and Exploration Update, page-318

  1. 1,979 Posts.
    lightbulb Created with Sketch. 654
    Ten bagger break down from a 2 cent SP

    Granville,
    Recommence TSF – imminent
    Commence mining ore grade material – imminent
    Complete TSF – pending
    Recommence Production – near term
    First Tin sales from G2, including Inventory from G1 – near term
    Merger/JV to extend supply to Granville processing plant – imminent possibility
    Exploration to extend LOM at Granville, and additionally Big H, Hazlewood – 2019
    Achieve ongoing supply for GPP to justify a PE of 10 – 2019-2020
    Expansion of GPP capacity with resource – 2020

    12 month valuation target of $50 million, equivalent to $5 million profit x PE10

    Upside factors to the valuation include,
    Tin price
    Grade increases and improved recovery higher than 60% factored for G2, lowering costs
    Increase production capacity of GPP to exceed $5 million profit per year

    Current value realized in MC = $5 million

    Taronga,
    Bulk ore sorting trial confirming increased recoveries and grade increase indicator– pending
    Upgrade PFS, NPV, valuation.
    T1 particulars for commencement – pending
    T1 commencing construction – near term
    Offtake for T1 approx. 500-700t tin $5-7 million profit – imminent
    Complete construction and commence T1 processing – March quarter 2019
    Confirm grade increase to above minimum .20% for the resource with a target of .25% and possibility of higher- T1 2019
    Upgrade JORC resource, NPV, Valuation
    Extend resource which currently ends in mineralisation that has potential to increase in grade with depth as stated in the JORC announcement 2013.
    Explore Torrington and JORC resource for LOM extension and complimentary NPV valuation – 2019-20
    Offtake for T2 - 2019
    DFS with upgraded and extended Taronga JORC resource, including LOM extension resources
    and a decision to mine 2020

    6-24 month valuation target equivalent of 50% of $50 million profit p.a. @ PE10 = $250m is conservative on completion of T1 and DFS to progress to T2

    Future potential of Taronga project with an increase in Jorc Grade of .25%, recoveries greater than 90%, tin price upside, extensions to JORC resource and LOM from surrounding targets and credits, exceeds $1 billion dollars on approvals, offtakes and funding for T2.

    Upside to valuation include,
    Increased JORC upgrade during T1
    Improved recoveries, lower processing and capital costs – confirmed during T1
    Tin price improving revenues
    LOM resource extensions.
    New metal discoveries and credits (e.g. lithium at Torrington)

    Current value realized at 2c share price = $25 million

    Black Snake Plateau Nickel Province,
    Drilling to confirm magnetic sulphide sources at Pembroke and Mt Cobalt - October
    Further drilling at Pembroke predominantly to progress towards a JORC resource – near term
    PFS for Pembroke with open pit potential.
    Further drilling at Mt Cobalt and Mt Clara
    Ore sorting trials to improve or be included in the PFS

    3-12 month valuation pre JORC and PFS is speculatively $100 million, based solely on Pembroke sulphide definition success at high grades and long intersections as previously reported, with further drilling progressing over the 3-12 month period.

    Future potential of the Black Snake Nickel Sulphide Province anticipating a Pembroke DFS, with additional Mt Cobalt PFS and surrounding areas upside exceeds 1 billion dollars on a decision to mine.

    Upside to valuation include,
    Grades of gold, copper, nickel and cobalt sulphides achieved at Pembroke and Mt Cobalt
    Establishing a JORC resource for Pembroke of High Grade Gold, Copper and Nickel plus Cobalt credit
    PFS, DFS upside after trial mining and ore sorting
    Nickel, Cobalt, Copper prices over the next 5 years
    Progressing to a decision to mine.
    Mt Cobalt, Mt Clara, Silver valley JORC resource definition

    Current value realized 2c share price = $10 million

    Dilution factor,
    Granville profits supporting T1 and Granville developments (possible part options conversions at 2c to aid in T1 funding)
    LIND dilution at 3.5c = 100 million shares
    Director and management fees of $1 million = 50 million shares at 2c average
    Funding for Pembroke and Mt Cobalt, approx. 200 million options at 2c average = $4 million
    Profits from T1 estimated between $5-10 million dollars with construction funded from G2/part options
    Total cash available for the next 12-24 months,
    $10 million plus profits from G2 (upside potential)
    $5 million plus profits from T1 (upside potential)
    $4 million from options at 2c (DGR, LIND, DIRECTORS)
    = $20 million plus with current cash on hand.
    Total potential dilution = 350 million shares or 17.5%

    $400 million market cap @ 2.33 billion shares = 17 cents per share. with upsides as indicated

    Coincidentally share price valuation came out similar to @mikez valuation.

    The valuation is only in my opinion and from my own research, please dyor
 
watchlist Created with Sketch. Add C7A (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.001(9.09%)
Mkt cap ! $3.001M
Open High Low Value Volume
1.2¢ 1.2¢ 1.2¢ $223 18.57K

Buyers (Bids)

No. Vol. Price($)
1 7016 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 281427 1
View Market Depth
Last trade - 15.19pm 30/08/2024 (20 minute delay) ?
C7A (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.