AUZ 0.00% 0.8¢ australian mines limited

Ann: Drilling extends nickel-cobalt resource potential at Sconi P, page-160

  1. 545 Posts.
    lightbulb Created with Sketch. 138
    Having been through the process on occasions with greenfield sites I strongly disagree with that assertion. The BFS is focused on the BUSINESS CASE. That is its purpose and it is designed to get the financiers on board and to get the BoD over the line. It does have technical content because without technicals you cannot calculate the ROI and Payback. However it would normally be a Class 2 estim,ate coming within the 10 to 15% of final cost. The next step is the refine and optimise the Business case technicals to create a FINAL Detailed Design to optimise OPEX and CAPEX.

    IMHO there is some absolute BS put in HC and it can be very difficult to stay with it for the few gems that come up.
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
0.000(0.00%)
Mkt cap ! $11.18M
Open High Low Value Volume
0.8¢ 0.9¢ 0.8¢ $36.10K 4.490M

Buyers (Bids)

No. Vol. Price($)
28 13679998 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 3385438 10
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.