1MC 20.0% 0.3¢ morella corporation limited

Ann: Altura Lithium Project - Shipping and Operations Update, page-183

  1. 167 Posts.
    lightbulb Created with Sketch. 18
    The difference between PLS and AJM sp is fast approaching multiple of four.
    All profits fast evaporating.
    Looks like the shipment still have some time to go yet.
 
watchlist Created with Sketch. Add 1MC (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.