https://hotcopper.com.au/posts/35427181/single
I started a thread "CR required" or similar on 5th Sept and gave some reasons why it was on the cards...the first post after m first post rubbished the idea. Now?
I think we are all just about calm re the news and await the results soon enough...no need to be negative or nervous (yet)
- Forums
- ASX - By Stock
- RAP
- Ann: Trading Halt
Ann: Trading Halt, page-101
Currently unlisted. Proposed listing date: 4 SEPTEMBER 2024 #
-
- There are more pages in this discussion • 126 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries