Blackwood was a wildcat well. To production test the well I believe that the well needs to be cased which Blackwood wasn't. Another well will therefore have to be drilled at a later date as the drilling rig was only contracted for a limited time. Don't take my word for it though, read MEO's announcements.
DYOR