No JV will double production or even change production. The plant is a fixed size. A second plant will be another $250M + kind of JV. Would love to get a hint from management about the nature of the JV proposal on the table. There has to be a payoff for both parties.
- Forums
- ASX - By Stock
- ATC
- Ann: Altech - HPA Market Update Lithium-ion Battery Sector
Ann: Altech - HPA Market Update Lithium-ion Battery Sector, page-53
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ATC (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $78.68M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ATC (ASX) Chart |
Day chart unavailable