KRR 10.0% 1.1¢ king river resources limited

2012 Scoping Study

  1. 101 Posts.
    lightbulb Created with Sketch. 62

    Hi All


    A little quite on HC today; I got bored and started digging for the original 2012 SS so I can compare with the new SS when it is released.


    Attached is the original SS released on the 23rd April 2012 (back then KRC was known as Speewah Metals Ltd-SPM):


    23 April 2012 Initial SS.pdf


    I gotta say all those figures are quite a big sum and am really excited in anticipation of the new SS.


    Further, they also released a proposed Modular Development of the project:


    17th July 2012 Proposed Modular Development.pdf


    Lastly, on 20th September 2012, the project was suspended:


    20th Sept 2012 PFS Suspended.pdf


    Although it sounded gloomy when the PFS was suspended in 2012, I am really hoping this time around the SS will proceed to PFS and subsequently get to mining stage. Referring to AVZ's (Lithium) SS - see below which was released recently, I noted if all works well from SS to commissioning, it takes about 2 years. Does anyone thinks KRC can do the same? Thanks in advance.


    https://hotcopper.com.au/data/attachments/1337/1337061-c03e7f5ae4f1376be6a8527b457be63d.jpg

 
watchlist Created with Sketch. Add KRR (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.001(10.0%)
Mkt cap ! $16.81M
Open High Low Value Volume
1.0¢ 1.1¢ 1.0¢ $4.615K 460.9K

Buyers (Bids)

No. Vol. Price($)
3 1751415 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 679699 3
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
KRR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.