Because its the best part of resources drilled to date. I can only assume they chose to do it that way as it saves them from redoing an entire mine plan at a later date.
In saying that it might have been a better option in terms of being able to report a proper SS to have it based on the existing JORC.
Probably a case of thinking about project development more than the market response which is a shame in the sense that there will be people that can't/don't want to take the LT approach here.
- Forums
- ASX - By Stock
- CLA
- Ann: Positive Scoping Study Completed on Opuwo Cobalt Project
Ann: Positive Scoping Study Completed on Opuwo Cobalt Project, page-147
-
- There are more pages in this discussion • 530 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLA (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $30.85M |
Open | High | Low | Value | Volume |
1.3¢ | 1.3¢ | 1.2¢ | $19.52K | 1.617M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 715668 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 1463820 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 715668 | 0.012 |
23 | 8225923 | 0.011 |
14 | 12953995 | 0.010 |
9 | 937441 | 0.009 |
4 | 870074 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 1463820 | 6 |
0.014 | 1950000 | 4 |
0.015 | 5213766 | 5 |
0.016 | 2339775 | 5 |
0.018 | 397000 | 4 |
Last trade - 15.58pm 18/10/2024 (20 minute delay) ? |
Featured News
CLA (ASX) Chart |