the qrtly mentions a resource estimate but never actual says what that figure is!
"Within this area, 26 holes were drilled on a 100m X 200m grid, covering 1.4km X 400m (deposit area) which resulted in the tonnage estimate referred to above."
I can't find any tonnage estimate in the whole report!
- Forums
- ASX - By Stock
- DMM
- am i missing something
am i missing something
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DMM (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.688M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
DMM (ASX) Chart |
Day chart unavailable