I think they need to state:
added tonnes to medium grade and if the average grade has increased.
added tonnes to high grade and if the average grade has increased.
increase of mine life.
estimated value of costs per pound based on added tonnes.
it’s hard to determine value from drill holes??? And there for increase SP valuations without the above.
i don’t think the general market are that smart
any thoughts?