Spot on, traction perhaps after theelection!!!
Updated peer EV/Resource spodumenecomparisons below after the announcement of the pending Albemarle’s 50%purchase of the Mineral Resources Wodgina Lithium Project in WA and AVZ’s ManonoLithium Project becoming the officially the largest Tier 1 hard rock lithiumJORC deposit in the World (>15% of World JORC calculated resources,currently).
Again, just another value to theoverall transparent light table to take into consideration, that’s all, nothingmore nothing less.
MIN 22/11/2018
Mcap $2,963M @$15.76 fps (188M fps)
Wodgina Ind/Inf res 259.2Mt @ 1.17% Li2O (Prov/Prob res 151.9Mt@ 1.17% Li2O 160ppm Ta2O5)
Albemarle purchasing 50% of Wodgina on an as is pre-productionbasis for Aus$1.59B
Wodgina value per res Li2O tonne (~3.03Mt contained Li2O) = ~$1,050t
TAW 23/11/2018
Mcap $164M @ 28.5cfps (578M fps, ~$11M cash, $16.2M debt)
Bald Hill (50%)Ind/Inf resource 26.5Mt @ 0.96% Li2O (Prov/Prob reserve 11.3Mt @ 1.01% Li2O 160ppmTa2O5)
TAW value per resourceLi2O tonne (50% of ~0.255Mt contained Li2O) = ~$1,286t
AJM 23/11/2018
Mcap $382M @ 21c fps (1820M fps, ~$10M cash, $173M debt)
Pilgangoora Meas/Ind/Inf res 50.5Mt @ 1.01% Li2O (Prov/Prob res 41.1Mt@ 1.05% Li2O)
AJM value per res Li2O tonne (~0.512Mt contained Li2O) = ~$746t
PLS 23/11/2018
Mcap $1,456M @ 83.5c fps (1744M fps, ~$90M cash, $138.5M debt)
Pilgangoora Meas/Ind/Inf res 226Mt @ 1.27% Li2O (Prov/Prob res 108.2Mt@ 1.25% Li2O 120ppm Ta2O5)
PLS value per res Li2O tonne (~2.86Mt contained Li2O) = ~$509t
KDR 23/11/2018
Mcap $511M @ $1.28 fps (398M fps, $7.9M cash, $106M fundsfor mine development + $40M cash
upon SQM deal beingexecuted/conditions ticked, no debt)
Mt Holland (50%) Meas/Ind/Inf res 189Mt @ 1.5% Li2O + Au (KDR100%) Meas/Inf res >1M ozs
KDR value per res Li2O tonne (50% of ~2.83Mt contained Li2O) = ~$361t
BGS 23/11/2018
Mcap $47M @ 20c fps (234M fps, $2.3M cash, capital raising due)
Goulamina, Mali (90%) Ind/Inf res 103.2Mt @ 1.34% Li2O (Prob res31.2Mt @ 1.56% Li2O)
BGS value per res Li2O tonne (90% of ~1.39Mt contained Li2O) = ~$38t
PSC 23/11/2018
Mcap $49M @ 2.4c fps (2,046M fps,$12M cash)
Arcadia, Zimbabwe Meas/Ind/Inf res 43.2Mt@ 1.41% Li2O (Prob res 26.9Mt @ 1.31% Li2O 128ppm Ta2O5)
PSC value per res Li2O tonne (87% of ~0.609Mtcontained Li2O) = ~$92t
AVZ 23/11/2018
Mcap $147M @ 7.8c fps (1,888M fps, $6.5Mcash, no offtake agreements)
Manono Global, DRC (AVZ 60%) B of Env lower resource 656Mt @>1.5% Li2O >900ppm Sn
AVZ value per res Li2O tonne (60% of ~9.8Mt contained Li2O) = ~$25t,prev $31t (02/10/18)
ManonoRoche Dure Peg, DRC (AVZ 60%) Meas/Indi/Inf res 259.9Mt @ >1.63% Li2O 844ppm Sn
AVZ value per res Li2O tonne (60% of ~4.25Mt contained Li2O) = ~$58t
Based on a peer on peer’s resourcesector EV comparison AVZ (post JORC resource) is still extraordinarilyundervalued, nothing more to say but … Bye …
………………………………………………………………………………………………………….
Top Ten Tier-1 Hardrock Lithium Projects
“The two highestgrade in the world — as well as the largest hard-rock projects — areGreenbushes in Western Australia and AVZ’s Manono. The Greenbushes pit is nowmore than 500m deep whereas AVZ is at surface — and has tin as a by-productcredit.” *, 11th September 2018