GSR 0.00% 1.1¢ greenstone resources limited

Mt Thirsty Vs, page-18

  1. 5,822 Posts.
    lightbulb Created with Sketch. 183


    The Jorc 2012 upgrade will be delivered with the PFS.


    If drilling is required to achieve Jorc 2012 it will be carried out previous to this.



 
watchlist Created with Sketch. Add GSR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.