Towie. Must be the adrenaline flowing in anticipation. Enjoy it, keeps you alive.Nice to read the NZ report Dugsab. Given the initial "relative simplicity" of the Agate Creek project, WHENever it gets going, and if that grade is maintained through that first 100,000 tonnes, that sizeable cash flow will certainly pay for the Jubilee drilling in NZ. Definitely not going the early crow with this mob, but, from what we SHOULD be expecting, it could be a very interesting 2019.
Dugsab, can you indicate if after the 1:300 consolidation to form Laneway and Bizzell's shares for debt (from Renison) conversion (that stuffed everyone up) that Bizzell is still down around $17 mill? He needs the SP to go over 2 cents to break even while, incidentally, most of those 4,000 shareholders who have not accumulated LNY shares since, need over 15 cents and some much more!!!
Be watching this week's trading with great interest.
- Forums
- ASX - By Stock
- SVG
- Ann: Results of Meeting
Ann: Results of Meeting, page-23
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add SVG (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.183M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
SVG (ASX) Chart |
Day chart unavailable