Hi seanl.
No i can't see any routered channeling for plumbing and electrical. Why during the testing phase aren't they using it?
Why didn't they replicate a certified concrete slab with an edge rebate to accommodate the external blocks to meet Australian or west Australian Standards?
Them brick nibs between openings that are only 2 blocks wide could be pushed over by hand no matter how strong the glue is? Single leaf blocks in areas like that require starter bars formed into the concrete either side of doorways and openings and protrude through the tops of the blocks and core filled to meet Australian Building Codes to give lateral support.
- Forums
- ASX - By Stock
- FBR
- Ann: First outdoor build using Hadrian X robot
Ann: First outdoor build using Hadrian X robot, page-83
-
- There are more pages in this discussion • 149 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
0.001(2.33%) |
Mkt cap ! $212.2M |
Open | High | Low | Value | Volume |
4.2¢ | 4.5¢ | 4.2¢ | $153.5K | 3.529M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 260488 | 4.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.5¢ | 1093065 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 153507 | 0.046 |
3 | 345430 | 0.045 |
4 | 381875 | 0.044 |
11 | 1247947 | 0.043 |
16 | 3350884 | 0.042 |
Price($) | Vol. | No. |
---|---|---|
0.043 | 500261 | 2 |
0.045 | 1093065 | 5 |
0.046 | 917410 | 3 |
0.047 | 405239 | 4 |
0.048 | 1094998 | 4 |
Last trade - 16.10pm 15/10/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online