Hi Larkin,
Prior announcement was that Completion operations commenced on 20 Feb (per announcement) and 6-7 days each. Now ready to be fracked?
Per your ealier post "Pump trucks - fracking completed" - Right or wrong?
Reserve stimulation now occurring and will take 5-6 days each. This sounds like fracking is just starting and that in approx 10-12 days production testing will commence.
Thoughts?
If anyone needs a good explanation of step-rate production testing click --> Step-Rate-Testing
Begin with measuring bottom hole pressure (BHP) and surface pressure (SHP). Inject pressure and Wait the designated period (e.g. 30 mins) Take another set of measurements. Iterate through the step cycle increasing pressure until BHP & SHP begin to convergemeasurement. The results of that test allow us to provide accurate information that is pertinent in the design of a lift system appropriate to the site. When armed with that information, you can use the proper pressure and flow rate to complete your operation.
- Forums
- ASX - By Stock
- CE1
- Ann: Reservoir Stimulation Operations Commenced
Ann: Reservoir Stimulation Operations Commenced, page-4
-
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CE1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.571M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CE1 (ASX) Chart |
Day chart unavailable