What confused me is some of that material is going to be mined in the pit excavation for the PEA being in pit shell. OK you take it and put it to one side if you want to.
Also, the cost of the plant design in the PEA does it include a dedicated gold gravity and or CIP circuit or doesn't it.
The best way to look at is as enhancements to the PEA which I'm pretty sure will be good.
I would like to think with these enhancements fleshed out compelling. Hence my comment about a T/O.
Which XAM has always been groomed for not being economically efficient to build Kharmagtai on its own due to dilution.
Thanks for the feedback.
- Forums
- ASX - By Stock
- XAM
- Ann: Complementary excellent Oxide Gold recoveries at Kharmagtai
Ann: Complementary excellent Oxide Gold recoveries at Kharmagtai, page-8
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add XAM (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
0.001(1.85%) |
Mkt cap ! $94.38M |
Open | High | Low | Value | Volume |
5.3¢ | 5.5¢ | 5.2¢ | $31.28K | 582.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 5.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 594687 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.052 |
1 | 200000 | 0.051 |
2 | 379910 | 0.050 |
1 | 100000 | 0.049 |
3 | 130000 | 0.048 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 594687 | 2 |
0.056 | 28500 | 1 |
0.057 | 314000 | 2 |
0.058 | 110000 | 2 |
0.059 | 658287 | 3 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
XAM (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online