I have some long-term experience/knowlege of the CC unit but a very limited knowlege of the gas industry but I can sat that de-watering was always a constant battle at this unit and, if I recall correctly, one of the main reasons to cease production in the 70's. I can only hope and assume that Marion has the new technology/ability to get this problem under control...