Hey man , hope your traveling well ! Theres a very interesting section in the report with regards to
Benefits to both AGK and the community AGK is currently planning to undertake a pilot project on one of the five tailings sites in the Mongbwalu area
This project has a budget of 1$ million and will use a portable machine to receive the tailings, concentrate them, aggregate the concentrate, and refine them to provide ‘value added’ The tailings will be fed to the machine by men using wheelbarrows
The machine can process up to 150 tons of tailings a day. The tailings contain 3-3.5 g/gold per ton of soil, so the project could yield 450-525 g/gold per day. AGK is also selling this project as being environmentally friendly. AGK is bringing in a South African NGO called MINTECH, which uses a mercury-free method to process the tailings. AGK also plans to reduce the footprint of the project by filling in the mined area with the excess processed material
"The tailings contain 3-3.5 g/gold per ton of soil, so the project could yield 450-525 g/gold per day"
Your a Gold guy also @ink , ever seen tailings contain 3-3.5 g/gold per ton of soil
Ps. The VEC and WFE Directors are already working with Mintech if memory serves , should not be hard to get all the details of this tailings setup between Mintech and Guy Roberts !
- Forums
- ASX - By Stock
- VEC
- Fewer comments on Hotcopper
Fewer comments on Hotcopper, page-268
-
- There are more pages in this discussion • 48 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VEC (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online