LTR 4.15% 92.5¢ liontown resources limited

Kathleen Valley Project Discussion, page-126

  1. 5,949 Posts.
    lightbulb Created with Sketch. 20444
    Hi @smit

    Great info mate. Good to have you here.

    Here are the maps below. (Starting from the large area map and zooming in by the others)

    The distance from Kathleen Valley site location to the Goldfields Highway is only 2km. The project can be considered next to the major highway.

    Then to Leonora is 192km by road.
    Then from Leonora to Esperance 600km by rail as you said.

    I think that would be a very good low cost option to move the concentrate to the port or to the refinery.

    Good to know that.

    https://hotcopper.com.au/data/attachments/1602/1602346-c95429ef4ad9e8b82f3085e22d125fcb.jpg


    https://hotcopper.com.au/data/attachments/1602/1602349-8e671e97dfb1949067ffaee9398ee5b4.jpg


    https://hotcopper.com.au/data/attachments/1602/1602363-127f530820fb294d9424bade6f49c69d.jpg



 
watchlist Created with Sketch. Add LTR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.