FYI
Valuation report
http://www.ady.com.au/uploads/news/c45147dee729311ef5b5c3003946c48f.pdf
This just posted on ADY website. Confirms what I have bben saying regards ORE being valued between $120M and $150M post JORC with clear plan for DFS and production in place.
This market cap is similar to RWD and MAK both of which have similar desirable (some say premium) projects at the JORC only stage of development.
good luck
Add to My Watchlist
What is My Watchlist?