As per the last update they still had 859m to drill till the next casing point before running WL logs over the Open hole section from 2481m to 4230m (estimated csg pt.). So thats apprx 1749m of Open hole to log. Depending on the number of runs planned, that will b a few days work.
Then its running the casing (probably 9-5/8" dia), cement it in place, pressure testing & then drill on to the next target section. So they should get some info about the net, gross payzone, poro/perm, gas/wtr saturation etc for the BW formation.
- Forums
- ASX - By Stock
- STX
- Ann: West Erregulla 2 Update
Ann: West Erregulla 2 Update, page-46
-
- There are more pages in this discussion • 137 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.0¢ |
Change
0.005(2.56%) |
Mkt cap ! $572.1M |
Open | High | Low | Value | Volume |
19.5¢ | 20.0¢ | 19.0¢ | $1.339M | 6.792M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
23 | 674181 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.0¢ | 741329 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 510321 | 0.195 |
49 | 2445436 | 0.190 |
19 | 1052674 | 0.185 |
26 | 1131067 | 0.180 |
7 | 139258 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.200 | 138218 | 4 |
0.205 | 839448 | 4 |
0.210 | 3926440 | 15 |
0.215 | 944882 | 13 |
0.220 | 1241001 | 18 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |