new proposal just out

  1. 12,488 Posts.
    lightbulb Created with Sketch. 301
    Key Elements of the Centrex Proposal Key Elements of the Centrex Proposal

    Centrex will guarantee to only export products from
    the Wilgerup project, through Brennan’s Jetty.

    Key construction activities would consist of:

    Refurbishing the #2 train un-loader to be able to handle iron ore.

    Building a new enclosed conveyor from train un-loader to storage shed.

    Either extending and modifying the existing fertilizer shed to increase storage capacity to ~120,000t or building a new shed.

    Building an enclosed conveyor from the storage shed to the loading berth.

    Centrex plans to either modify an existing ship loader or commission a new loader to directly load Panamax vessels. (ABB Limited supports an engineering evaluation to determine upgrade requirements)

    Ship approximately 20 times per year (~ 2.6 weeks). Loading ~36 hours.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.