Report from 0600 hrs 7 July to 0600 hrs 8 July 2008
Drilling : Drilled to 975m RKB and stopped to prepare hole for surface casing. Completed a wiper trip to condition hole for casing. Assembled BOPs and pressure testing equipment. Preparing to pull out of hole with drillpipe to run 9 5/8” casing.
Geology : Encountered interpreted top of Cadnaowie Formation at c.951m RKB which is 110m high to prognosed depth of 1061m RKB.
Targets : Prognosed primary reservoir targets are top Algebuckina Sandstone, Poolowanna Formation and the Tirrawarra Sandstone. Other horizons may have potential.
- Forums
- ASX - By Stock
- CTP
- another announcment
another announcment, page-2
-
- There are more pages in this discussion • 62 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $39.22M |
Open | High | Low | Value | Volume |
5.3¢ | 5.4¢ | 5.3¢ | $52.12K | 978.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 454057 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 46397 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 454057 | 0.053 |
1 | 10000 | 0.050 |
1 | 280000 | 0.049 |
1 | 1000000 | 0.048 |
1 | 136131 | 0.047 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 46397 | 1 |
0.055 | 18545 | 1 |
0.056 | 102917 | 1 |
0.060 | 210909 | 3 |
0.067 | 10000 | 1 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online